Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why ELCB's are not useful for operation theater equipments ?

Answer Posted / abhilash

Operation theatre using life saving equipments,and even if
there is small leakage, the circuit will trips off and if
it happends during a major operation, it should not be
happen.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

application s to shunt coil

1918


Why colled 440V to 3-phase supply.

2148


what is mean by D.O. in distribution line poles?

1667


is IS says that neutral should be brought to switch box. and this one is a recomended practice

1866


a governer in an Ic engine controls the

1193


Why need 3phase machine double earthing?

1777


Saving in copper achieved by converting a 2 winding transformer in to an auto transformer is determined by A voltage transformation ratio B load on secondary C quality of core material D size of transformer core

3145


what is the relation between reactive power and power factor for the what is the limit of reactive power and power factor

2103


Name two types of electrical analogous for mechanical system.

1214


What is the main purpose of c.f.b.c.boiler

1719


Can anybody just suggest about the scope of Electrical design with ETAP software?Just guide me?

3803


how to changeover ups in this power failur time?

2005


When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number

2177


how to calculate short circuit current for the busbar

1508


Is vtg is controlled by the resistor? if else how much?

2088