what is the relation between seventh day strength & twenty
eighth day strength of cement concrete
Answer Posted / ravisobhan
7 days strngth is at 2/3rds of 28days stength. this is
required to check the concrete strength gaining in view of
removing formwork and to take preautionary measures incase
of failures before deshuttering.
| Is This Answer Correct ? | 33 Yes | 0 No |
Post New Answer View All Answers
what is the minimum cement content for M20 & M25 as per is code -456(2000).
how to calculate quantity of bricks in circular manhole with examples.
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
about higyway engineering
What is the absolute pressure scale?
What is thumb rule in quantity and cost estimation of a residential building?
What are moment of inertia and its importance in civil engineering?
What is the sugested procedure of water purification for public supply?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
Stringer How many cm goes to landind
Why are steel plates inserted inside bearings in elastomeric bearings?
pls give me some basic informations in construction of a structure?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What is the difference between one-way slab and two-way slab?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.