what is the relation between seventh day strength & twenty
eighth day strength of cement concrete
Answer Posted / balaji
compressive strength of 28 days cube is more than the 7
days cube
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
what is the hanekom repairing material after concreting work
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
what are RIB slabs explain about it
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
how much need sand and cement for 1 cft roof construction?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
How much cement,sand,bricks and water needed for 1square metre brick work?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
who to find building iron rod strenth
How much does the leaning tower of pisa lean?
How many kilo-newtons equals 1000 kilogram?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?