Answer Posted / henri groenewald
A four quadrant metering system is the metering of bi-
directional energy flow. The system must be able to meter
leading and lagging reactive energy (varh) for import
active energy (Wh) and leading and lagging reactive energy
(varh) for export active energy (Wh).
| Is This Answer Correct ? | 67 Yes | 9 No |
Post New Answer View All Answers
What is clock position of Transformer?what are the clock positions are there?and what is different of them?
how braking & making capacity of circuit breaker are calculated?
why star point of HT motor not earthed?
if i am in front of transmission line how to know that current direction without any equipment
Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.
what are the assumptions made in swineburne's test?
What the main causes of transient interruptions on Over-Head Distribution Lines?
where does 22kv line starts
what is ground fault in ACB?
how current is reverse from its normal direction during the fault?
in 6.6 kv vaccum circuit breaker vaccum bottole vaccum capacity ????
How many types of instrument cables are there?
What will be the voltage impact on secondary side of two transformers with different vector groups when both voltages are compared.
IN induction motor pf is increased using capacitors.what will be the effect on motor and system when very large capacitor is accidently installed and pf goes leading.
I have a situation to design sub-Distribution board/Panel meant for feeding power sockets. In the incomer CAN i Take TP MCCB with Neutral Link and All the outgoing feeders with to sockets with TP MCCB and Neutral Link? P.S : My System is IT Earthing