Answer Posted / mks
it is ratio of cummulative % retained to 100. it indicates
ratio of fine sand to coarse sand required for specific
work.
range 2.2-4
| Is This Answer Correct ? | 22 Yes | 27 No |
Post New Answer View All Answers
How to calculate paint drums per meter square
What Reinforcements Are Used In The Process Of Prestressing?
When column of building is abutting the boundary line,then suitable footing advised is
What is meant by scaffolding coefficient?
why are you joining in this (applied post) job and your aim for this job
what is the weight of 6000 psi concrete in lb/cft?
Why are steel plates inserted inside bearings in elastomeric bearings?
how to calculate testing date
PL.tell me about civil engineering questions with answer
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
Explain moment of inertia?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
what is the 0 value in quantity surveying
how to nfind out the specific gravity of sand.aggregate,water please help...