Answer Posted / mks
civil engineering is alterations in nature that include
compromisation with nature and not fighting with nature,
for developement and growth of human life for survive.
| Is This Answer Correct ? | 3 Yes | 6 No |
Post New Answer View All Answers
Name the main components of a cad gui?
how to calculate total cost for slab 35'×8'
What is demising walls?
Minimum and maximum size of the building components
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
How many square meter can mason layout chb per hour
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
How to check slab shuttering level.? Or check list for slab ?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
Define angular dimension?
How can i do RCC rate analysis?
what is the formula to find the diagonal shape stirrups?