I am applying for vizag steel plant management recruitment
for 2009 please can anybody send me the pattern of the
written test paper
Answer Posted / padmaja surabhi
hi friends ,i am also applying the vizag steel plant job.if
u know the pattern n syllabus means plz send the
information to this id pappu4ujo@gmail.com.iam
belonging to elctrical stream
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
A man said to woman " your only brother's son is my wife'sbrother". How is the woman related to the man's wife..
A ship is away from the shore by 180 miles.A plane is travelling at 10 times speed of the ship.How long from the shore will they meet?
If TAFJHH is coded as RBEKGI then RBDJK can be coded as ---------
Himesh works thrice as much as Bhavin. Find the number of days it would take to complete the work if both work together if Himesh takes 60 days less than Bhavin to do a work.
A man shows his friend a woman sitting in a park and says that she the daughter of my grandmother's only son. What is the relation between the two
Yadi a or b kisi kam ko 12 din me pura krte h tatha b or c usi kam ko 16 din me pura kr sakte h , pahle a is kam ko 5 dino tak karta h fir b 7 dino tk kam ko karta h sesh kam c 13 dino me samapt kr deta h to c akele kam ko kitne dino me pura krega?
In a cycle race there are 5 persons named as J, K, L, M, N participated for 5 positions so that in how many number of ways can M make always before N?
In a fraction, if 1 is added to both the numerator at the denominator, the fraction becomes 1/2. If numerator is subtracted from the denominator, the fraction becomes 3/4. Find the fraction.
Subbu starts from a point O at 10.00 am , overtakes Ajay, who is moving in the same direction, at 11.00 a.m. and Bhuvan moving in the opposite direction at 12.00 (noon). If the speed of Bhuvan is one fourth the speed of Subbu, at what time will Ajay and Bhuvan cross each other.
Which of the following fractions is less than 1/3
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, If f(X)= f(X-1)+f(X-2) for X>1 then X= ?
the ticket sales s for a company increases 25% from standard sales to 60 tickets sold, then 60 - s =:
be * be = acb a,b,c,e are non zero numbers find b,e.
A finishes a work in 12 days and B finishes same work in 14 days.If they work for a day alternately with A beginning, how many days will it take to complete the work?
In a storage stall of 5x3x2inch.How many blanks of size 2x1x1inch can be stored..