Answer Posted / sushant s das
Determine Cement quantity required for any required grade
of concret in present working condition that is Quality of
sand, aggregate & weather conditon.
OR
Depending on the condition of weather, quality of sand,
aggregate, water & etc Cement required for required grade
of concret is called Design Mix.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How can we make a hole in a solid rectangle using solidsworks?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
Detection of a beam & a girder areββββ
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
Use of coping on terrace wall and in 4" wall is compulsory or not ?
What does civil status mean?
Slump Values for works?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
How much cement will require for 1Rmt Skirting laying
How to calculate the load of partion in flat slab if we use brick?
How to calculate quanty of steel in four leg stirrups?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
whaat is blister in box girder bridge and what is its function..