Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Is it possible to power factor more than unity?

Answer Posted / amit

No

Is This Answer Correct ?    16 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What's the difference between non break power supply and non break non short break power supply

1397


why is a power transformer used only occasionally?it is used to step up at generating stations?and that needs to be done all day long !!!!!!!

1814


Is it possible to make a 5P10/ CT Ratio 50/1A Burden 5VA

1679


in dc shunt motor if field winding is shorted then

1784


How does zener phenomenon differ from avalanche breakdown?

1102


what irequirment need to be followed when working on live equipment

1723


if i get a drop in my 1st year and the i clear my 2nd year and 3rd year all clear and i dont have any back logs so can i be able to sit in campus selection??

1809


What is the practical way to calculate the cable size for known ampere load?

1376


in our all power plant have connected in grid and grid voltage and plant voltage is same, but as per as electrical concept the power will transmit from high potential to low potential but here altough same,then how power transmit from power plant to grid.

2276


I Just want do EHS Certified Certification Distance Course From Govt approved,so can any body provide me details.

2081


what is the responsibility of C license holder in industry?

9102


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2766


Explain Active power,reactive power,how its related to each other , & inductive ,capacitive.

1865


What type interview questions ask in Electrical technicians

1718


how to calculation increase power factor for single phase

2249