the amount of gypsum usuallyin the manufacture of cement

Answer Posted / ketan

4.785%

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define What is the force exerted by the Tacoma narrows bridge?

808


we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants

1860


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2036


What is different between DI Pipe and CI pipe?

1678


For fine aggregate which is most suitable River sand or crusher sand & why ?

1437






Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

1341


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

2017


400 ku d/c clearess ketan hota hai?

1682


WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?

1693


Explain major difference between auto level and dumpy level?

853


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1612


How to testing voids of filled aggregate in bitumen mix design

1563


how clculate excavated or backfilling quantity by simpson's rule

4826


Minimum concrete cover in slabs, columns, beams, foundation and other st?

798


though u r a civil engineer, y r u interested in tcs???

2251