Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

which software better design in structure design or Rcc
design(STAAD PRO,TEKLA STRUCTURE)

Answer Posted / narayan

i think its tekla structure

Is This Answer Correct ?    14 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method

1767


what is Brest Wall?

1337


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

2348


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2344


What are some structures that may be subjected to fatigue?

1144


What is packing Factor ?

1437


What are the responsibilities of a site manager?

1131


Explain how you can turn off the display for dimension in CAD?

1156


What is the use of extruded feature in solidsworks?

1224


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2450


Does brick grows bigger every year?

1141


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

2317


How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??

2090


i want texture painting pwd data

2079


Process of pcc in wateredug

2258