What is interaction or interface bet PP with FICO and PP with SD
Answer Posted / mohan r. desai
Dear Readers,
First of all let me make it very clear. The question should
have been What is the integration between PP & FICO and PP
& SD.
The integration of PP with FICO is related or integrated in
more than one way. There will be Profit Center. There will
be Cost Center for each Work Center. When we refer as a
Profit Center all the revenues get booked against the
profit center and all the costs get booked in the Cost
Center with the Costing Element.
The integration of PP and SD starts with the creation of a
Sales Order. Production Planning starts after the Sales
Order creation.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
How to create opbject dependencies in a bom for a configurable material?
Define stock requirement
Explain the gaps and the steps involved in them.
What is process keys
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What are all the settings done for configuring the integration of pp with fico?
What is the transaction code to run MRP for sales order?
What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?
Integration between PP and QM Module.
In cost controlling information system mention the fields that are listed in the list screen of the report?
What is MTS and MTO and the difference between them?
Define mrp controller
What is prt (production resource tools) in sap pp?
What is the use of t-code cs20 in bom?
What is the need of mrp list if the stock requirement list is already given?