What is interaction or interface bet PP with FICO and PP with SD
Answer Posted / mohan r. desai
Dear Readers,
First of all let me make it very clear. The question should
have been What is the integration between PP & FICO and PP
& SD.
The integration of PP with FICO is related or integrated in
more than one way. There will be Profit Center. There will
be Cost Center for each Work Center. When we refer as a
Profit Center all the revenues get booked against the
profit center and all the costs get booked in the Cost
Center with the Costing Element.
The integration of PP and SD starts with the creation of a
Sales Order. Production Planning starts after the Sales
Order creation.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Are there any reports in sap to list of material requirement from ltp ?
Explain what is routing in sap pp?
What are the levels of batch, explain batch determination process?
Explain why there is need of production version?
What are the parameters are there in Order type or in dependent para. config?
What is the purpose of using capacity planning?
What is phantom item & sub contracting
What is end user training
How to move to the realization phase?
Explain the Difference between the Discreet and REM.
How to attach a drawing for a material to bom ? Is it possible ?
In tm, if a group of employees gets 10 days of annual leave, what will be the time evaluation status?
List out the basic procedure for dispatching operations in capacity leveling?
What are sequence, parallel, overlapping, splitting and where can we assign these
What is group bom?