Answer Posted / khilendra pant
the instrument transformers are
1. p.t.(pottential
transformers)= for voltage
2. CT (Current tranformer)=for current
we use instrument x-mer for protection purpose.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What are the advantages of a three-phase system over a single-phase system?
where reactive power is used
Difference between Earthing Truck & Earthing trolly for HT panel
how can we select the type of wire.what factors we have to look on it , do we have some formula to calculate it. please guide me on it
What type of a DC motor would you use for a lift?
in a simple IDMT relay we use neutral point of ct for earth fault then what is the requirement of neutral ct and cbct?
what is meant by loss of field in a DC motor? how a universal motor works?
can u tell me the promotion from oiller to enginer
What are the different towers used in 132kv transmission line? what are the differences between the P,R,S towers used in 132KV and detailed explanation
what is the total power generation in india?
How to test Alternator stability test for REF relay
How to calculate wire length,size & current? ( related to control panel)
I AM GOING TO ATTEND APTRANSCO ON 26TH OCT 08.PLEASE SEND ME ANY MATERIAL OR TYPE OF QUESTIONS OR EXP QUESTIONS.
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.