Answer Posted / vasudevan
1. drainage pipes
2. pipe accesories & auxillary structures
3. envelope materials
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Which is the direction for positive angle?
What is the cost difference between site mix and ready mix concrete per cubic meter
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
How is the leaning tower of pisa supported?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What quantity of 1.0 m3 bricks required?
What are the different methods for drawing an arc?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
What is a projection line?
Any strength is a stress but any stress is not strength
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
What is the difference between a wood shake and wood shingles?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum