What is difference between the Build version id and software
version id ?
Answer Posted / ganesh
Build is kind of an internal release without having any
major change request from the client side.as they said
above, there will be the plan for giving the new build say
for an example twice in a month or something.. in that for
our referrence we will give the build version number .
Normally build version number should be
XX1.0 ( XX is the short form your application)
But in the case of Software version , suppose u gave the
software version as XX in .net 3.0 but in future they need
an update version XX1 in .net 3.5 then its called an
software version.. not like IE6 to IE7 thats something
called an compatiable (upgradation )
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
10 scenarios for security testing using gmail applications?
How do you scope,organise and execute a test project.
where do we work with Application, web and Database servers Means which type of applications.
how can we do database testing. In database testing we verify the data integrity and data validation. how can we do testing of Index, triggers, views, ransactions,cursors etc
What are the cases why parameterization is necessary when load testing the Web server and the database server?
what are risks and contigencies(solutions) of an ecommerce (online shopping and bidding project)application?we describe this in Test plan can anyone tell me abt this?
what types of bugs will we find out in banking projects
What is change request, how you use it?
Test approach to windows scheduler?
tell me 3 defects in FRS document, while doing FRS review which u have found in the last 3 years ? could u plz answer brahma412@yahoo.co.in
What are the Major Functionality for a ATM machine ??
what is system testing? as test eng, what do u do in sys testing? who invoves in sys testing?
Hi there, I am new to the world of testing. Is there any place where I can have a look at an actual specification documents or test plans or test cases. This will help me in generating a level of confidence. Looking forward to your replies
In a systen design to work out the tax to be paid: An employee has Rs 4000 of salary tax free. the next Rs 1500 is taxed at 10% , the next Rs 28000 is taxed at 22% , any further amount is taxed at 40% , the nearest whole Rs, which of these is a valid boundary value analysis test case ???? a)Rs 1500 b)Rs 32001 c)Rs 33501 d) Rs 28000.
Difference between adhoc testing and error guessing?