What are the Steps for Testing of 20MVA (make:-CGL)
Transformer? How many Test we have to do?
Answer Posted / s.sheikhussain
TYPES OF TESTING IN TRANSFORMER FOLLOWING TEST
1) IR
2) PI VALUE
3) Magnetic CORE balance
4) MAGNTISING CURRENT
5) Ratio test
6) Vector group
7) SHORT CIRCIT TEST
8) BDV
9) WINDING RESISTANCE
10)TAN DELTA
11)MARSHALLING BOX SCHEME CHECKING
12) Visual inspection
13) Tap changer tests
14) Special tests to see the condition of the dielectric
strength
| Is This Answer Correct ? | 22 Yes | 2 No |
Post New Answer View All Answers
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
What is measurement?
what mean by analog ,digital,numerical meters and relays? say the example?
please forward me the type of questions which would rise while me attending to 33KV Electrical License to my mail ID:vadrevu_raghava@yahoo.co.in
How 48-relay (incomplete sequence) functions?
what id a dry type transformers and its function ?
what is proper capacitor placement? How to evaluate capacitor size?
does a DG set has low fault level as compared to that of a transformer.If yes then why.
How to check the thermocouple is correctly connected to cable for K type? (i,e positive pole is connected to non magnetic conductor and negative pole is connected to magnetic conductor)
please give some hindalco placement papers for written exam
What is the purpose of stablization resistor in high impedance bus bar protection
Iwould like to know barc interview questions
physical identification of HT & LT panel
why +24 v and -48 v give to BTS? If -48v protect from surge then why we not use -24 v?
what is the maximim current drawn by 1 phase and three phase welding machine