c=a/b ; a-1=c What is the relation between a&b
Answer Posted / harini
c=a/b
c=a-1
=>b=a/c
=>b=a/a-1
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
A man buys 12 lts of liquid which contains 20% of the liquid and the rest is water. He then mixes it with 10 lts of another mixture with 30% of liquid.What is the % of water in the new mixture?
Two pipes A and B when working alone can fill a tank in 36 minutes and 45 minutes respectively. A waste pipe C can empty the tank in 30 minutes.First A and B are opened After 7 minutes. C is also opened . In How much time will the tank be full ?
In school there are some bicycles and 4 wheeler wagons. One tuesday there are 190 wheels in the campus. How many bicycles are there?
Integral ET(epsiolan transpose)*sigma*dV P=strain displacement vector Q=stress-strain deformation Find [K]
The average of 4 consecutive even numbers is 27. What is the largest number?
Given the length of the 3 sides of a triangle.Find the one that is impossible? (HINT : sum of smaller 2 sides is greater than the other one which is larger)
There are 9 coins. One of 9 is less weighted and others have equal weighed. Find the minimum no of balances to find the defective coin?
No of financial emergency announced by president
In a two-dimensional array, X (9, 7), with each element occupying 4 bytes of memory, with the address of the first element X (1, 1) is 3000, find the address of X (8, 5).
A contractor employed 200 men to complete a strip of highway in 200 days. After 150 days he found that only 3/5th of the strip is complete. How many additional men should be employed to complete the work on time?
In which year will the 21st century begin?
a man is standing before a painting of a man and he says I have no bro and sis and his [painted picture] father is my father’s son?
Find the next series: SE QU EN TI ?
if a man byes 1 lt of milk for 12 rs and mixes with 20% of water and sels it for rs 15 thgen what is percentage of gain
15 men take 21 days of 8 hrs. each to do a piece of work. How many days of 6 hrs. each would it take for 21 women if 3 women do as much work as 2 men?