how many earthing required for ups, what should be the
earth voltages

Answer Posted / natarajanamkumar

Mr.Mani that is not Dedicate Earthing,and Body Earthing.
that is 1.System Earthing 2.Equipment Earthing.
thanking you.

Is This Answer Correct ?    10 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is process of anneling transformer core

1461


How many lightning arrestors to be installed on 50MX60MX10M building and is there any formular for that?

1473


What is the count of hvdc transmission lines in india?

626


explain the types of drives

1559


why does connected a indutor with mnsformeretering core of current transformer ?

1641






what about the power of wattmeter at starting and loding?

1655


How can we findout the maximum efficiancy of Transformer? At which load?

1608


when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.

1581


Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,

1404


percetans

1707


1. The DC generaror,s induced output emf is connected with a DC motor(as load). when increasing the load of the motor by using brake drum or any way. what are the parameters will changes in both motor and generator(voltage, current, resistance, frequency, speed, torque, power, flux etc...) 2. Similarly for AC generator and AC motor 3. similarly if using DC batteries instead of DC generator, What happens?

1690


Why using synchronising methed in DG's sets?

1721


Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.

1261


i have applied for the post of RRB section engineering chennai board please send me previou papers and solved answer. my mail id jagarapusrinivas@gmail.com

1483


How REF protects transformer alone? explain with diagram.

1012