As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / narendra
a. If building is underconstruction
1. see if errors are seviour or not
if yes do reconciliation with experts
if not anlyse losses and make possible
corrections
2. if errors are serious reconstruct entire part or
whole but at any cost do not leave as it is. you can re
embers cost from others but not at the cost of structure
and human life which are supposed to dwel in it in future.
b. If building is complete
1. check the errors, whether are with immidiate
affect to stability of structure, if errors are serious
find solution with experts and immidiately do needful with
SOS situation.
2 if errors are causing no immidiate effect like
leakages, crcks, loose tiles etc. do reconciliation and get
the problem solved.
Any way, on top priority see that specification errors are
not affecting structural stability and then functional
stability and lastly aesthetic sence of the structure, in
nut shell.
2. If errors are not so serious
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
how many material required for brickbat water proofing of toilets.
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
What are the phases inspections are done by local authority while construction?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
60-70 grade of Bitumen is VG-30 ?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
what is mc arther pile?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
how much of the strength comes from post-production curing
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What is the difference between EPC,DBOOT and BOOT.