Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?

Answer Posted / narendra

a. If building is underconstruction
1. see if errors are seviour or not
if yes do reconciliation with experts
if not anlyse losses and make possible
corrections
2. if errors are serious reconstruct entire part or
whole but at any cost do not leave as it is. you can re
embers cost from others but not at the cost of structure
and human life which are supposed to dwel in it in future.
b. If building is complete
1. check the errors, whether are with immidiate
affect to stability of structure, if errors are serious
find solution with experts and immidiately do needful with
SOS situation.
2 if errors are causing no immidiate effect like
leakages, crcks, loose tiles etc. do reconciliation and get
the problem solved.
Any way, on top priority see that specification errors are
not affecting structural stability and then functional
stability and lastly aesthetic sence of the structure, in
nut shell.

2. If errors are not so serious

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Slab quantity 

2040


What is Critical path in Ms-Project ?

1198


What is meaning of FREE STANDING STAIRCASE ?

3032


how much area can be platered by a mason for exterior

1956


Explain what is change order request?

1134


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2125


Wat is meant by Aecron brick?

2085


detailed calculation of the amount of cement used?

2074


What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?

1900


Formula for calculation volume of essentric footing

1825


how to convert sand in Cft to Kgs

1937


What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?

3092


In cement concrete how to check a quality of material also proportion of material at site ?

1859


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2236


how to identify the failure of building by expansive soils

1660