Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?

Answer Posted / narendra

a. If building is underconstruction
1. see if errors are seviour or not
if yes do reconciliation with experts
if not anlyse losses and make possible
corrections
2. if errors are serious reconstruct entire part or
whole but at any cost do not leave as it is. you can re
embers cost from others but not at the cost of structure
and human life which are supposed to dwel in it in future.
b. If building is complete
1. check the errors, whether are with immidiate
affect to stability of structure, if errors are serious
find solution with experts and immidiately do needful with
SOS situation.
2 if errors are causing no immidiate effect like
leakages, crcks, loose tiles etc. do reconciliation and get
the problem solved.
Any way, on top priority see that specification errors are
not affecting structural stability and then functional
stability and lastly aesthetic sence of the structure, in
nut shell.

2. If errors are not so serious

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

2353


Why is the use of granular sub-base in concrete carriageways not preferred, explain?

1309


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2633


how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

2220


What is geopolymer based concrete?

2773


wat would be the probable interview questions and GD topics for IOCL exam?

9858


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1992


if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix

1960


HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

2186


What is semirigid connections?

2210


What will you do if a portion of load bearing wall collapses under your supervision?

2046


what is project?

2433


What is soil enforcement?

1286


what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete

2359


pls mail some more tecnical qustions at msaranya2610@gmail.com

2143