in trains i have seen the terminal which is connected at
the top of the train is positive .where is negative ?
track? i dont think so
Post New Answer View All Answers
A low wet bulb temperature indicates
What is the formula to calculate distribution transformer De-rating on iron losses basis
what type questions asked in hp cl
How to calculate capacitor bank size at a load 800kVA.
why in an industry; machine having rated 200 h.p stopped after power factor is maintained above 0.97 lag by control panel in view-of energy saving
How to address the servo drive for motor
could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com
What is Primary And Secondary Injection Test of Relay and Other Electrical Devices. How IT is carried out.
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
ELECTRICAL DRIVES: can a motor load system with passive load torque can have equilibrium speed in second quadrant
how technical is calculated in 11kv line and lt line
can i use the six sigma method which is used in management area, in state estimation of power systems?
are there rmu for 3 transformer?
What is the permissible maximum flux density in transformer core?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,