Answer Posted / solomon ujuanbi
(1) BRC
(2) Chippings
(3) Cement
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How much cement will require for 1Rmt Skirting laying
Explain major differences between routing maintenance and major maintenance.
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
List out the potential risk factors for workers on the construction site?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What is Base Shear ?
Why does the pressure increase under soil?
Sir how to find cutting length for footing steel bars in the shape of "u"
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What is meant by engineering drawing?
How do you calculate load bearing capacity of a waffle slab?
how to calculate spacing rod in column
What is construction mitigation management?