what is the difference between arch dam and gravity dam.
Name a gravity dam in India
Answer Posted / sivaraj
the length of the arch dam is less and depth is high. the arch dam distributes on both side of dam.
| Is This Answer Correct ? | 17 Yes | 8 No |
Post New Answer View All Answers
Explain what is the difference between built area and super built up area?
What is chemical composion test
The foundations are placed below ground level, to increase?
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
Explain the mechanism of cavitations in pipes and drains?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
how to disign cuplock shuttering and it's matireal requirement snd any related web site
who to find building iron rod strenth
how to find quantity of concrete in PCC M15
How much cement and sand required for 9"brick wall per square metre
cause of cylinder test failure
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What is the software used in civil engineering?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m