difference between steam hammering and water hammering
Answer Posted / subhransh shekhar
Initially,the steam line is in ambient temp condition.when it is suddenly charged then some portion of the line remains cool in comparison to the other.due to nonuniform heating.in the cooler area condensate ball foRmed and vacuum is created.and all the molecules rushed towards that particular area.and hammering created. water hammer-this is caused due to the impact caused by suddenly closing and opening the valve in a flowing fluid line.
| Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
An employ has after increment has Gross Salary 22000 rupees per month. Earlier he was covered in ESI . now should we deduct ESI from his salary or not.
Which element is added in steel to increase resistance to corrosion ?
What is usage of rotameter and hydrometer.
Explain the function of cooling water expansion tank.
How many litres did 1 cubic meter contains?
What are materials used for manufacturing of gears ?
Is there significant affect on the output of modern gas turbines due to low frequency.
After any cause of repaired how i start the engine by slow speed 800 to 900 rpm electronic control moudle engine [cummins]
apgenco prevoius question papers
What is the ratio of specific heat of air?
Explain the difference between the points of inflexion and contraflexure?
any body hv a experience of L&T pget interview for mechanical thn send me question and experience to me as i hv interview on 8 th may so send me as soon as posssible on my mail id nilesh.spy2000@gmail.com
What are the causes of emergency stop in a steam engine?
What is the strongest pistol in the world?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb