in trains i have seen the terminal which is connected at
the top of the train is positive .where is negative ?
track? i dont think so

Answer Posted / yokesh

the nagative is track @ the train coming time some
induction was produced that induction was recived by the
booster transformer,

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much load can take a 16 mm aluminum cable 3 phase

1269


why h parameter are called as hybrid parameter?

1549


How to use computer cpu ups use for home inverter circuit board

1295


condition Autotrip facia come on control panel of electrical transmission line?

1094


what is mean by dry frequency

1947






What is the working principle of MIG welding? and its out put Voltage?

2736


my bachelors was done with EEE now i got admit in NU with CS as course. how to answer this qns 1) why u choose cs? 2) why u changed from eee to cs

1281


In cable sizing calculation (determining the max route length of cable) why we choose the shortest length between cable length of full load current Iflc & starting current Istart?

2783


What does bode plots shows?

683


BSNL TTA EXAM QUESTION

1772


What Is Connection APFC Panel In Compony.

943


Draw a block diagramof Three UPS systems connected in Parallel mode?

1675


We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?

9888


What is steady state response?

679


how can calculate resistance box for 15 kw, 6 pole, RV-230, RA-42 motor

2891