in trains i have seen the terminal which is connected at
the top of the train is positive .where is negative ?
track? i dont think so
Answer Posted / yokesh
the nagative is track @ the train coming time some
induction was produced that induction was recived by the
booster transformer,
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How much load can take a 16 mm aluminum cable 3 phase
why h parameter are called as hybrid parameter?
How to use computer cpu ups use for home inverter circuit board
condition Autotrip facia come on control panel of electrical transmission line?
what is mean by dry frequency
What is the working principle of MIG welding? and its out put Voltage?
my bachelors was done with EEE now i got admit in NU with CS as course. how to answer this qns 1) why u choose cs? 2) why u changed from eee to cs
In cable sizing calculation (determining the max route length of cable) why we choose the shortest length between cable length of full load current Iflc & starting current Istart?
What does bode plots shows?
BSNL TTA EXAM QUESTION
What Is Connection APFC Panel In Compony.
Draw a block diagramof Three UPS systems connected in Parallel mode?
We normally make oil soak pits under Transformers. Oil from soak pit goes to collection pit. We provide granules/pebbles under transformers. My question is weather granules/ pebbles to be filled in soak pit or not? if yes upto what level?
What is steady state response?
how can calculate resistance box for 15 kw, 6 pole, RV-230, RA-42 motor