can any one tell me what is the difference between MRP and
MPS?
Answer Posted / high
MRP is for the material requiremnt planing and MPS is for
master production schedule for which MRP has been carried
out...
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
What are the t-codes for creating, changing and summarizing bom?
What is Inspection Points?
what do you mean by planning time fence
What is Production scheduling Profile and use of it?
What is the use of mrp group?
What is the t-code for changing production order and to display production order?
Difference between PP and PI.
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
How to create PRT master record?
What is Auto GR?
How do you do capacity planning ?
What are the different type of BOM usage?
What is plm (product lifecycle management) in sap pp and what is the use?
What are the basic dates?
How to create prt master records?