Answer Posted / abhijit
to protect the sides of excavations against erosion and
slope failure.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Why joints are provided?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
which has high compressive strength between hollow block and brick masonry?
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
Please let me know what is the simplest way of Calculating Mix Designs
How do we determine the specific gravity of a cement?
What is the purpose of the gap in the road on this bridge?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
How can i display 5 asterisk and another 5 asterisk )?
How will be cutting in timber plate size 600*400 column size
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??