Answer Posted / prasanna
A requirement linked to a demand is called a pegged
requirement.
Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Consignment matl how will be use
Difference between Manual reorder point and Automatic reorder point.
Explain what happens to plan after it has been converted into production order?
What is planning horizon?
How can I use variable size items?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What do you mean by basic dates
How many levels of Flexible Planning are there?
Integration between PP and SD module.
What is a ‘bom’?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
In lsmw which is the most important step?
• How are basic order dates determined?
Explain the process of Material costing.
What is end user training