what is the difference between arch dam and gravity dam.
Name a gravity dam in India
Answer Posted / mihir parmar
In acrh dam the load is distributed on both the side of dam
as well as load is transfered in circular form on the
ground. where as in gravity dam load is transfered strait
to the ground. and kakrapar dam on river tapi is the
exampal of the gravity dam.
| Is This Answer Correct ? | 50 Yes | 6 No |
Post New Answer View All Answers
Define mirror?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
How to calculate material and labor required for 100 m2 plaster?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
how much required strength of cement concrete bricks(size 230x115x75mm)
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
How can you distinguish between sorption, absorption and adsorption?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
what is grade intersection?
What are the common ways of demolition?
how to calculate mivan shuttering matrial
to minimize budget cost of building , what can i do
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.