how many amps in 1 KVA? V=440v, PF=0.8 and FREQ=50Hz
Answer Posted / golak bihari naik
2.27A
| Is This Answer Correct ? | 44 Yes | 31 No |
Post New Answer View All Answers
Why to keep capacitor bank off while generator running.
What will be the size of copper cable (each for 3 phase and 1 neutral) from Service connection Kit-Kat to Panel Board (i.e. to main switch) for a 6 pole 3-phase AC induction motor of 200 H.P. capacity? Amp-255 A, Frequency:- 1450 rpm.
What is meant by celling voltage & current in excitor ?
how to measure earth resistance of a substation
What should be setting for alarm,tripping and cooling fan on for power transformer's oil temp. and winding temp. indicator?
In synchronization circuit what is the function of Interposing voltage transformer(IVT)and Reverse voltage transformer(RVT)
how to commissioning the genset with amf panel?
Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18
Type of motor stater detail and working detail
How to design inductive load for 3 phase 440v and maximum 5 amps for star or delta? Can we use a 15kW, 1450rpm motor for 15kW, 960rpm apllication?If yes.how......n.if thesame motor used what`s it`s sideeefect.
can i connect wavetrap in 2 different phase in EHV line?
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?
what is solkor relay and which condition it will act?
Advantage of LT panel vs HT panel