while extending the material master view after saving error
is coming that the field material number is defined as a
required field,it doesnt contain an entry. After selecting
that it is showing the particular material may be locked.
Pls do the needful.
Answer Posted / vikram patil
You have need exit from material change session
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Can’t one material be assigned to more than one operation in a routine?
What is finite scheduling?
What is group bom?
What is scheduling
list the important tables used in pp.
How do you restrict the data to be entered in the payroll area?
Explain different inspection type you used .
What is collective order. Pre requisite of the collective order?
Mention what is the production process in sap?
What is MRP group?
What are the parameters are there in Order type or in dependent para. config?
Can't one material be assigned to more than one operation in a routing?
How you get the ticket?
Where we have to specify the teardown time in one operation?
What is the uses of production scheduling profile and what the configure have you done current project