Answer Posted / pratheesh
Its all depends upon the capacity of the diesel engine.
There is no fixed numbers of cylinders. Larger diesel
engines should produce more power, so number of
cylinders also more.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
How can i get my certificate of competency as an electrical supervisor? I have complicated my B.Tech from Uttarakhand technical university this year (2012).
If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.
What do you mean by transformation ratio of instrument transformer?
What id difference between power and energy?
How to calculate or formula to calculate rhe power in 2 phase system ??
how can we understand that where we have to use ac or dc coil for solenoid valve and why?what is the different between coil of ac and dc explain please.
how to calculate the loss tangent of electrical cables
How to calibrate or test an LT Air Circuit breaker 440 volts, 35 KA, 800 Amps ?
How much current will a 5 HP delta connected motor at no load will take?Is tat need a starter
why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?
Why 3 phase induction motor getting supply in body if one of it's phase is cut
Draw a block diagramof Three UPS systems connected in Parallel mode?
i am completed in B.E(Electrical and Electronics Engineering) with 8 months experience in Quality Control Engineer at Bharathi Industries,Coimbatore.
how we do Vector group ,magnetic balance and tap changer test in Transformer?