Answer Posted / naresh
Single Phase meter is a measuring instrument which records
the power consumed by the load in terms of 'KWH'. The meter
records the consumption based on the following formula...
Power in KWH = Voltage x Current x Power factor x Total
number of Hours utilized.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
How to calculate cable size by using load.?? Any formula...
How to confirm the Phase shifting Transformer VECTOR GROUP relation , as below ZNy11.45d10.45-ZNYy0.15d11.15
State magnitude criterion.
what is Fault level? why it is calculated? how will u decide same for our plant?
Why does the radius of armature is less than the radius of pole shoe?
what happens when dc generator coupled with cycle shaft.also explain what happens when its loaded
what's the simultenous maximum demand (SMD)..what the diffrent MD and SMD?
What are the three major categories of error?
What will be the fault current of any system when its generation is 10% of BASE generation( FUll Load )?Will is 10% or the same as full base calculation?
Do you know what is dry-out test in x'mer
please suggest some good universities with low cost iam in totally full confusion so please help me my profile gre 283 and ielts 5.5
How do apply electrical 'c'license......pls advice
I am a possesor of c licence from 1993. I forgot to renew during the year 1998. During that time I was working at TNEB to till date. Is there any possibility to get renewed? or to apply for a new one?
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram