Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what do you mean by 1 ton in AC`s

Answer Posted / vivek agrawal

One Ton of Refrigeration is cooling capacity of a machine
that can freeze one short ton of water at 0 degree celcius
to ice at 0 degree celcius in 24 hrs.

1 TR = 12000 BTU/hr=3024kCal/hr=3.516kW

Is This Answer Correct ?    33 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How does a digital electronic meter work??????

2051


The simple way of finding the leakage quantity and % in compressed air distribution system

1666


How good are you in resolving the commercial issues to Employer's advantage?

2358


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2025


How does cost of generation from hydropower plant compare with other sources of electricity?

1047


3ph motor running with unequal kw and different pf what are the reasons

1854


I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com

1803


What is the maximum operating temperature for a thermoplastic insulated cable?

1127


What are the Formula of computing Back up Time of 500kVA UPS with 4 Battery Banks, each bank composed of 43 pcs of Batteries 12V150Ah. How to compute the Back up Time of UPS? We have also 3X500kVA UPS running in Parallel same composition as I write above.

1345


how to test YNyn0 vector group in transformer?

3882


what is the use of expulsition protective gap in 11Kv line.

2123


Please, if 1kw is equal to 1.25kva; how then do I know how many kva in 7.5kw?

1654


How can we checked Killo Watts of Motor & Alternator?

2147


what curve and rateing would you use for a three phase 0.75kw motor?

1987


Mention the disadvantages of low power factor?

1124