what will happen two jobs have same name are submitted
Answer Posted / sathya
yes. you can have many jobs with the same name, but only one
job will be executing with same name, others will say DUP on
the status column.
| Is This Answer Correct ? | 1 Yes | 12 No |
Post New Answer View All Answers
how do you use commitment control in rpg?
what is the difference between do while and do until?
What is file identifier where we can use?
How Chain operation copies the record's data to the input buffer for the program?
what is data area and how it is used in rpg program ?
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique
what is the procedure and explain about real time scenario.
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
How can we know running job is batch or interactive?
How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
can I touch the array during treatments?
what is kids-rpg?
What are the types of identifiers?