when we supply in primary side of transformer then the
supply goes in secondary side?how it works?
Answer Posted / farha
When we supply an alternating voltage to primary, an
alternating current is produced in the primary.Suppose this
current is Ip.This current links with primary turns Np and
produces NpIp(mmf).this mmf sets up a flux which is set up
in the core.This flux links with most of the primary and
secondary winding.since this flux is also alternating, by
Faradays's law of electromagnetic induction, an emf is
induced in both primary and secondary windings.The
secondary induced emf causes a current to flow through the
load connected to the secondary winding.
Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Whether power factor should be high or low? Why?
What Is Connection APFC Panel In Compony.
A 10 MVA, 66KV, 50Hz, Y-connected 3-phase alternator has synchronous reactance of 0.635 Ù. It is working at full load at 0.8 lagging p.f. condition. Find torque angle, neglect armature resistance.
What is the phase relationship between the primary and secondary voltages of a transformer?
what sort of general awareness questions are asked in o.n.g.c entrance exam?????????????????
Define the term Capacitance and Inductance?
why do you add the load short circuit impedance when considering short circuit amperage. It seems that you should only consider supply. If you need to consider loads and you don't know what loads are to be added , what would be a good sub-transient reactance rating for the loads?
is it possible to test of bus bar in high rise building without completed full floor ?
How can we increase fuel-power ratio of any DG set?
design a LV scheme for a 15 storied building?
How to select transmission line type (i.e. 11kv or 33kv) for new established industries
What is different between Difnit time and instatous over current relay
the problem faced on star or delta winding connection??
what purpose to use excaiter in DG.?
Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.