Answer Posted / ayush chamoli
according to fortescue- unbalanced 3 phase voltage nd
current(during fault) r made up of three symmetrical
component having positive,negative nd zero sequence.
zero sequence-when all the symmetrical components r in
phase nd hve same magnitude.
+ve sequence- when symmetrical components r in 120 degree
phase wrt to each other nd hve same phase sequence as
supply voltage.
-ve sequence-when components hve 120 degree phase wrt each
other nd hve opposite phase sequence compared to supply
voltage(3-phase).
for 3phase(symetrical or balanced fault)- only +ve sequence
exist while zero nd -ve sequence r zero.
LG fault all sequences r equal.
LL fault-only + nd -ve sequence(as no ground thats why no
zero sequence).
LLG fault-all sequences nd hve different values.
Is This Answer Correct ? | 67 Yes | 5 No |
Post New Answer View All Answers
what does a string of resistors in a series will do?
Use of switch mode power converter in real-time basis?
What is the different types of cable & current capacity of cable
What are the essential characteristics of signal flow graphs?
Can we use both Electrical & mechanical interlock between tow breakers? if yes how, please explain
What is the difference between single point and double point bonding. please kindly detail about bonding of cables.
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
Can anybody tell abt concrete encased earthing or grounding?
what are the condition that makes hooter blow?
we have a lot of model of rectifier but thyristor rectifier is the most rectifier that use in power system. Do you know why this rectifier is used?
I want formula to calculate cable size as per load given in length & amp. I searched many sites but didn't right answer. Please reply me asap.
Why lose 1 phase voltage in 33kv to 415v stepdown transformer
Brief me about maintenance planning & sheduling of machine tool.
when we decide to use soft starter drive or vfd drive in mcc to operate apump?
Dear All we are having a problem in G120 BOP showing alarm A0503, F0052, F0060 we can not remove fault alarm ,Please any body help us. kowsar