Answer Posted / gopinath
GRID means interconnection of different generating stations
and load centres which are all tuned to constant voltage
and frequency.
a GRID can be a NATIONAL GRID OR A REGIONAL GRID depending
on whether we are connecting to nations or two regions.
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
I have 4 busbar of 1000 ampere. we use 4 busbar to make 4000 ampere in one phase.my problem is that when we applied 60% load on that then busbar produced high noise.what is the reason of that and how can i minimize that noise.
What is difference between slip rings and carbon burushes?
Earth bits close or open. Which is correct
What are the two segments of nyquist contour.
What is the formula to find out two phase active & reactive power
how can tell us the AC indoor or outdoor which Tr and formulls
Explain the operation principle, advantages and disadvantages of the following converters: a) A 12 pulse converter b) A Switch-mode inverter c) A thyristor inverter
How it can worked plc based electrical system And which type of software using.
What is kvar?
Write down the brushes of a de machine.
role of europe union in UK safety legistlation (electrical safety)
Any one who apply for Ferro Scrap Nigam Limited cn join with me at rajuhalder@indiatimes.com or 09669717028
Difference between field rheostat and armature rheostat.
How do i perform grounding of star point of Genset (400V) for making connection with step up transformer of DELTA-DELTA (400V to 20KV) ? while Genset itself has its own neutral and grounding bus bar inside genset breaker box whereas we have another neutral and grounding busbar in synchronizing panel next to genset at maximum distance of 6meter, would someone pls advice if we can only perform neutral grounding in synchronizing panel or should we ground neutral on both places inside genset breaker box and synchronizing panel.
Distribution transformer we provided 2 separate earthing pit for Body and 2 separate earthing pit for neutral,we can not connect separate body earthing pit to other earthing pit but we do metal glanding in secondary side cable termination in both side, transformer and PCC panel (LT Panel), is this safe for transformer and other equipment?