Is it possible to block a material to be deliver from an
specific plant without block the creation of sales orders?
So in summary the material has to be blocked just for a
specific plant in the moment of delivery. One sales order
with different plants per line could be shipping except the
lines that contain this plantX
Thanks!.
Answer Posted / ddgg
Hi Eldi,
Thanks for your answer. Actually I found the field MARC-
MMSTA in the Purchasing view so I created a new entry to
block the delivery by plant. I the current master data I
don't have the MRP-1 view available.
Thank you!
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to assign division to sales organization?
How is credit control determined in sap?
what is the main purpose of maintaining the master data?
What is the difference between the item proposal and dynamic proposal?
Can you configure two diff free goods items for one single item?
Define whether the material can be used at which sales and distribution process
I have a shopping mall. If a customer comes to my mall and if he purchase or not anything I give him pen free. How we map it in sap?
Can a sales area belong to different company codes?
one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance
What are the different lists in sap sd. Explain and give examples.
At present we have the STATIC credit check, for only one customer we want DYNAMIC credit check from next month. no need to go for configuration ? only should go for master data for that only customer.
What is the item category group? Where do you maintain it?
Do you participate in implementatation? What is your role in imp. Phase? what have udone in implementation? Which methodology you use in imp.?
Hi my name is subharajyoti and i have 6 yrs of exp in technical sale and at present doing sd module trainig in bangalore, i am looking for exp in real time projects, pls help me out
What is the purpose of 'output determination'?