what are the parameters of jobd?give in detail.&what are
the parameters of subsystem...????
Answer Posted / syam
It is not "jobd" can be WRKJOBD Work with Job Descriptions
use command WRKJOBD *all *libl Enter, system will you all
Subsytem/Job for Create Change Delete Copy Display.
Subsystem Parameters = CRTSBSD SBSD(xxxx/*LIBL) POOLS()
MAXJOBS(*NOMAX) TEXT(*BLANKS) SGNDSPF(QDSIGNON) SYSLIBLE
(*NONE) AUT(*LIBCRTAUT)
You can use WRKSBSD command also.
Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
what is *place and *auto keyword in prtf ?plz explain
How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?
how do I preserve and clean the array?
write an RPG program to calculate the marks of 5 students (A,B, C, D, E)in 3 different subjects (eng, math, sci) an display on the screen
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
what is the necessary keyword needed to scroll subfile records?
What are the types of identifiers?
how can I tell when to replace the array?
Explain mdt?
how do you use commitment control in rpg?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
Interviewer asked me write down DDS for load all subfile .can anybody write dds
which program rpg or cl is efficent to update a transaction onto a database file and why ?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.