What process model u r using 4 current project.
(Eg: Water fall model, prototype model etc) and why?

Answer Posted / saritha

In our company we are using modified V model ..as
development and testing of the project are done
simultaneously

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain automated testing?

865


I need to learn who the major stakeholders are in each of the 7 stages of the SDLC. What is the best online resource?

891


I am having 1.5 years of exp. in Manual testing.What I have to do now? Should I do ISTQB Certification or Perl/Shell Scripting Languages? OR Anything else.Please Guide me properly.

2845


Which testing method is used to check the software in abnormal condition?

830


What is the main benefit of designing tests early in the life cycle?

873


Do you know what the mean of cmm and tmm?

801


how i find swing lenth of probe ?

1874


Explain black-box testing?

765


What is gorilla testing?

789


What is the function of the software testing tool 'phantom'?

1163


Your audit indicates that the corporate quality management system did NOT work as it should have. How should this finding be categorized? 1. Minor nonconformance 2. Major nonconformance 3. Deficiency 4. Observation 5. Catastrophic failure

2289


What is difference between SAN and NAS? How SAN is better than NAS?

2163


What is the difference between testing techniques and testing tools?

830


To test a function, what has to write a programmer, which calls the function to be tested and pass test data.

816


What is v- diagram (model)?

770