What process model u r using 4 current project.
(Eg: Water fall model, prototype model etc) and why?
Answer Posted / saritha
In our company we are using modified V model ..as
development and testing of the project are done
simultaneously
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain automated testing?
I need to learn who the major stakeholders are in each of the 7 stages of the SDLC. What is the best online resource?
I am having 1.5 years of exp. in Manual testing.What I have to do now? Should I do ISTQB Certification or Perl/Shell Scripting Languages? OR Anything else.Please Guide me properly.
Which testing method is used to check the software in abnormal condition?
What is the main benefit of designing tests early in the life cycle?
Do you know what the mean of cmm and tmm?
how i find swing lenth of probe ?
Explain black-box testing?
What is gorilla testing?
What is the function of the software testing tool 'phantom'?
Your audit indicates that the corporate quality management system did NOT work as it should have. How should this finding be categorized? 1. Minor nonconformance 2. Major nonconformance 3. Deficiency 4. Observation 5. Catastrophic failure
What is difference between SAN and NAS? How SAN is better than NAS?
What is the difference between testing techniques and testing tools?
To test a function, what has to write a programmer, which calls the function to be tested and pass test data.
What is v- diagram (model)?