Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

hi i am chemical engg. 4 year student i am not placed till
year what will i do for my batter futere

Answer Posted / magesh

Be confident in what you do. Move to a city like Mumbai or Bangalore and try searching over there. A lot of interviews happen in those cities. Develop good language and communication skill. Remember everyone will get opportunities. But it is how you make use of this opportunity.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how can I find out a sulfuric acid recovery plant disigner?

2508


hello everyone do anyone have interview questions for any chemical industry please email me at

2179


What is the method adopted to minimize shell side pressure drop in a shell?

1219


oil field interview question

7025


What is a solvent?

1098


Explain what are the methods involved to test helium leak testing in a vacuum system?

1195


What are the effects of oils on the properties of Polyolefins?

2938


Explain the different types of equipments for the conveyance of solids?

975


MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)

2398


Define a barometric condenser?

1104


can you explain about the design calculations and procedure of boiler

2889


How can one determine if a particular solid can be fluidized as in a fluidized bed?

1087


What are the customization steps in sap?

1097


When an expansion is joint needed on the shell side of a shell and tube heat exchanger?

1088


Hi. I have completed my masters in chemical engineering from M S University in year 2008 and now going to do MS Chemical engineering in Lamar University. I am planning to appear for interview in two weeks from now. What are the expected questions from VO regarding masters after masters ? and wat should i expect to give reply ? kindly give your suggestions. Thanks

2055