Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is min and max voltage between earth and neutral/phase
if it perfect earthing?

Answer Posted / rajasekaran.raman

what suresh said is correct only for second and third ,but
1st how could you say that value?

Is This Answer Correct ?    8 Yes 14 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which Class insulation is prefered for the sandwich Busducts ? Why?

2077


why burdens of VTs is more than CTs?

1852


Explain the advantages and disadvantages of thermal power plant?

1142


what is the thumb rule for determination resistance of resistor?

2366


Difference between RCCB, RCBO and ELMCB.

4143


What are the main parts of central chiller plant? Explain the function of each stage.

4856


What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?

1575


Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.

1811


What is evaporator & condencer & compressor

2214


i have total 8 dg sets for synchronizing and 2 buscoupler,1 sectoin dg no 1,2,3,and 2 sectoin dg no 4,5,6,and last section dg no 7,8 ....if buscupler no 1 and 2 is off mode ..than dg no 1,2,3,will synchroniz of another dg sets?

1871


Hi everyone, I'm Lachuu, recently joined automation company as PLC Engineer. I have certain basic question, I request all big gurus and seniors to answer these question. Because this will be very helpful to me as well starters like me. How to design a control circuit (ex: pick & place - my current project) Yamaha robot PxYx series controller RCX222, using 6 cylinder double acting, plc keyence kv p16r 2 expansion unit for input and output each. How to select panel terminal mcb elcb powersupply. My main concern in some projects how to select dc power supply, mcb rcb(I came across dif bt b c d curves, but stil confusing, pls help me :-(. I would really appreciate all who are going respond to this question.

2006


distribution transformer de-rating formula on over limit iron losses  

2354


Why power genaration in India is at 50HZ while America its 60HZ

2336


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

2016


what is the standard duration after failure EB power

1905