Answer Posted / zulkifli abd. rahman
maximum demand is calculated and bill by a kW demand meter,
which record the highiest kW value consumed in one 30
minutes period, over a monthly billing cycle.
| Is This Answer Correct ? | 12 Yes | 13 No |
Post New Answer View All Answers
How will calculate losses in an multi core Aluminium LT cable of different sizes & upto what length we can use a LT Cable ?
Explain about retrofitting of machine tool.
1.why we are using blocks in withoutgaplightning arrester 2.why we ar using bushing in withoutgap lightning arrestor
Why reactors use before incoming of ac vvfd drive?
How each of the following losses occur in d.c machines (i) copper (2)core (3) windage (4)friction please help me
Define availability (operational)?
why we are not giving the zone 1 trip command to the master trip relay
how we calculate torque ? how we improve it ?where torque will either motor or generator ?
what will happen if frequency is below 50 hz?
which network topology offers the greatest level of tolerance?
Is there any Institution for giving M-tech in Electrical engineering for those who r in service? Give the details please.
What is stepper motor?
Is there chopping current in resistive circuit
how to calculate the conductor size for certain KV transmission line and distribution line?
why the difference arise between HT reading & LT reading (submeters fixed in complexes, apartments etc)if the power factos exceed from 0.9 to 1 can the ht meter reads fast?