Answer Posted / zulkifli abd. rahman
maximum demand is calculated and bill by a kW demand meter,
which record the highiest kW value consumed in one 30
minutes period, over a monthly billing cycle.
| Is This Answer Correct ? | 12 Yes | 13 No |
Post New Answer View All Answers
The synchronous machine excitation system explain
Define reserve-generating capacity?
What is the effect of pi controller on the system performance?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
what is effect of length of air gap on performance of dc motor and generator?
how to control the speed to switched reluctance motor
what is the illumination level required for child play area?
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?
Why do we avoid electrical conduits in floors at apartments?
Define liftable weight of a transformer? Does the total weight of transformer include oil weight?
What would cause a 240v choke that should give 110v out on a 16w lamp to gradually increase to 160v?
A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is
what is magnetizing current test in power transformer
how to calculate the capacitor to maintain power factor?
Form S and "c" license application both are same? @ tneb portal