Answer Posted / panna lal jaiswal
After Confirming it as a bug,you have to post it in to bug
tracking tool.Then the status of bug will be "NEW".Our Team
lead or any senior person will review it and if it is really
a bug, then he/she will change the status to "OPEN".if
he/she confirms that is not a bug and change the status to
"CLOSED".
All the Open Status Bugs send to the developer team.there
team lead will assign the bug to corresponding
developer.he/she change the status to "ASSIGN" and add the
corresponding developer name.when developer fix that
bug,he/she changes the bug status to "TEST".
If the development team lead confirmed that this is not a
bug, then he rejects that bug with valid reasons.Then the
status of that bug will be "REJECTED".
If he/she confirmed that this is not required for the
current build, but may be useful for the future
releases,Then he change the status of bug as"DEFERRED".All
the deferred bugs will be considered for future releases.
All the test status bugs will be mail to testing team. the
corresponding tester test that bug in new build or patch and
change the status as "CLOSED" If it is fixed otherwise to
"RE-OPEN" if it is not fixed.
All the reopen bugs will be mailed to the development team
and then the above cycle repeats.
| Is This Answer Correct ? | 11 Yes | 2 No |
Post New Answer View All Answers
What are tools of performance testing?
how recovery manager works in winrunner
Do write a separate test case for regression testing? If it is yes, explain how to write the test case?
What is a testbed in manual testing?
what is system testing? as test eng, what do u do in sys testing? who invoves in sys testing?
What is unit level testing?
Different types of design diagrams that supports to write test cases ?
what is the architecture of your current project?
Why is it impossible to test a program completely?
What are the tasks of test closure activities in software testing?
What is the difference between baseline and traceability matrix?
What is integration level testing?
What a team leader will test first when s/he will get new module to test?
In interview How do explain in Testcase of Calcuator,Cellphones, Email testing?
Write a Test scenario for Outlook Search functionality.