Answer Posted / sivasubramanian
U0 is the r.m.s. value between any insulated conductor and
earth , i.e. metal covering of the cable or the surrounding
medium;
U is the r.m.s. (root mean square voltage) value between
any two phased conductors of a multicore cable or of a
system of single core cables.
| Is This Answer Correct ? | 55 Yes | 3 No |
Post New Answer View All Answers
What is contract demand in solar system?
how we calculate the short circuit capacity of the busbar in LV & HT?
is it possible to test of bus bar in high rise building without completed full floor ?
WHY TERTIARY OF POWER TRANSFORMERS IS LOADED WITH EQUIPMENTS LIKE CT,PT,ISOLATOR AND CB
Greeting to all members, How to calculate spill current when we have different ratio CT and Class for REF(Low Imp) I have 500/1A 5P20 @line side n 400/1A CL.X @ Neutral.
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
sir i had plane to do some project with the base of hopkinson test in AC supply its possible
ht side line to earth voltage
Why we use 4-20 mA Analog signal for the PLC input? Why not 0-20 mA? Why not 5-25 mA?
What is the use of iron core in a transformer?
how could we know the size of cable by physical view?
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
Ratings of power transformer,Distribution transformer.
WHAT IS SUBSTATION & ACCORDING TO VOLTAGE HT,EHT SUBSTATION EXPLAIN IT
Approach of a cooling tower is the difference between temperatures of what factors?