how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?
Answer Posted / shashwati nag
Ast=0.5fck/fy(1-(1-4.6Mu/fck.b.d.d))bd
| Is This Answer Correct ? | 336 Yes | 169 No |
Post New Answer View All Answers
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Formula of area of crane hook
why the openings of sieves are square io size?
How many Sft of Level Plaster per Kg
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
how to calculate reinforcment in staircase cranked beam?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
Who built the sears tower?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
how much percent are used 20mm,10mm?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
Define a polyline?
what is constat for brickwork
How many bricks are there in 100cft?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?