There are two sand clocks(timers) one complete totally in 7
minutes and other in 9-minutes we have to calculate with
this timers and bang the bell after completion of 11-
minutes!plz give me the solution.
Answer Posted / rayudu
You can ring the bell When the 7 min clock completes 10 min
and the 9 min clock completes 12 min
Sol: One complete round takes 8 min per both
If you ring the bell at 11 min First clock shows 10min and
second clock shows 12min
(10+12)/2=11min
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
what is the difference between the normal testing and embedded testing?
Why we use decision tables?
9).explain difference between stab & driver? 10). who will conduct integration testing? 11). explain difference between system testing & functionality testing? 12). explain compatibility testing? 13). explain performance testing? 14). explain inter system testing? 15). explain difference between smoke testing & sanity testing? 16). explain difference between re-testing & regression testing? 17). you prefer manual testing or automation
What is cause-and-effect (fishbone) diagram?
What is defect analysis?
Explain smoke testing?
Explain traceability matrix?
What is Test Script Planner
What is coverage measurement?
What is execution?
Please some one answer these Q's 1.Modules in Pension Domains ? 2.What Should we Test on Pension Domain.? Thanks in Advance Stewie
A type of functional testing, which investigates the functions relating to the detection of threats, such as virus from malicious outsiders?
What is the objective of regression testing?
what are Link Speed available for FCOE SAN?
Explain the tasks involved in planning and control.