Answer Posted / anand kumar shukla
according to my knoweldge the difference between mccb,
Acb, Vcb is depending on the fault interruption capacity
and rating of voltage and current level.
mccb-250amp
acb-1650 amp
vcb -up to 11 kv and up to 1650amp.
| Is This Answer Correct ? | 5 Yes | 13 No |
Post New Answer View All Answers
WHY TERTIARY OF POWER TRANSFORMERS IS LOADED WITH EQUIPMENTS LIKE CT,PT,ISOLATOR AND CB
Can we put 3 layers of cable tray while installing tray
What does Bode plot tell you?
Why in power plant projects we see DOL starting method used for motors upto 160 kW instead of star delta method
we are having 110 Kv,250mA Electrostatic precipitators for coal fired boilers. what will be static voltage and current after discharge and what time it will remain before earthing?
which type of questions asking for solar companies?
How to calculate the volumetric capacity of a oxygen & Nitrogen gas Cylinder if pressure is 145 kg/cm2 & water capacity of cylinder is 67 liters.
What are the commonly used schemes for the bus zone protection?
Why are iron cores in transformers made laminated?
what is the vvvf in the dumbwaiter?? or lift. what is the actual process?/
why magnet has north and south poles only why not east and west and why we are considering as north and south poles? why cant we consider as east and west?
hi , i have 150 kw loud and we need 50 m cabil,i want to know wich size cabil we use. thanks
When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number
what is the difference between circular wdg & ractangular wdg?
A TRANSFORMER 440/400V,DELTA/STAR CONNECTED.THE NEUTRAL CONNECTED WITH GROUND CABLE THAT IS DIRECTLY CONNECTED TO THE PANEL,FROM PANEL IT IS CONNECTED EARTH PIT.IS IT RIGHT? IF IT IS RIGHT LEAKAGE CURRENT AFFECTED.SECONDATY IS PROTECTED WITH EARTH LEAKAGE RELAY.