What is the difference between single reinforcement
Answer Posted / venky
if the reinforcement is placed on the tension zone the beam
is termed as single reinforced beam(generally bottom side)
If the reinforcement is placed on both tension and
compression zone the beam is called doubly reinforced beam
| Is This Answer Correct ? | 134 Yes | 4 No |
Post New Answer View All Answers
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What is Joule Brayton Cycle?
What do you mean by tolerance factor of concrete ?
What do we mean by partial moment release ??
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
What is a tensile strength? What is the tensile strength of wood?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is BPM in concrete demolition hammers. what is better a higher value or lower
How to calculate laplength for 3 floors
how to calculate MR 9(derivation)
Rate analysis of Vitrified tile in cement mortor 1:3