Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

I WANT TO KNOW SOME BASIC CONCEPTS RELATED TO
INSTRUMENTATION

Answer Posted / jose

14.7 psia = 0 psig
27.7 in H2O = 1 psig

Is This Answer Correct ?    12 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is 3 element control system

1478


why direct mounted pressure transmitters is always installed with DBB ( double bleed block) valve in process line or top of the tanks ?

2046


which processor is used in dcs.

2247


find the kp ki kd from the transper function G(S)=29.44s+04707/1.5349s2+s

1923


How addressable fire systems work? Pl. send details with architect.(Loop), also send details regarding Gas system. Pl. help me.Thanks

2094


What inherent design and operating principles are included in a modern control system to use predictive maintenance practices to increase overall system reliability?

2088


how to calculate orifice sizing? and tell me if pipe size bet 50mm t0 200mm then we can use pipe flange??? and above 250mm pipe size should i use D & D/2 Flange? is it right or wrong?

1887


Q-Explain the different load conditions that will produced different offset which may or may not be acceptable to thhe control function

2177


What you mean by multi stage control vavles?

1799


Why even multiple power supplu r used in instrumentation system?

4966


which type of filter gives the constant phase characteristics?

1922


Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75 The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is: WARNING: Could not connect to equalize destination. (7001) Retrying. Number of retries = 0/1 ERROR: LdXopsLoadMain: connect error 10060 ERROR: Processing terminated due to connection error. (7002) Equalization end with errors. STN0149 ---- ERROR = 2 WARNING = 1 ---- Background: >Updated the ExaOPC software on the STN from 3.60 to 3.75 >STN operating system is Windows Server 2008 R2 >HIS operating system is Windows Server 2016 Stanard Solutions attempted include: >Ensuring all IP addresses are correct and all networked devices can be pinged. >The ability to ping a device using its host name from another device ( from HIS) >Ensure both devices firewalls are disabled. >The antivirus installed on the STN is disabled. >Ensuring both devices are within the same workgroup. >Added both devices to each other's Host and LMHost files. >Running IT Security tool after changing any administrative settings.

2184


protection relay watchdog contact operation?

1950


what is isloted barrier how it works and what are the main purpose.how it make safe area.

2119


Difference between ultra sonic flow meter

1991